Sign up now
to enroll in courses, follow best educators, interact with the community and track your progress.
Download
Inventory Cost (in Hindi)
339 plays

More
This lesson throws light on inventory cost.

Harshit Aggarwal
Cleared UPSC ESE twice with Rank 63 and 90 in mechanical engg. Got 99 percentile in GATE. Cracked ONGC, BHEL,ISRO, SAIL, GAIL successfully

U
Unacademy user
Sir Venezuela also released its crypto currency petro.
AMIT SAINI
2 years ago
i mentioned it dolesh if i am not wrong plz confirm .
Dolesh Singh
2 years ago
yes sir you have mentioned but you haven't mention petro just like sov.
Dolesh Singh
2 years ago
yes sir you have mentioned but you haven't mention petro just like sov.
  1. COURSE : INDUSTRIAL ENGINEERING LESSON: INVENTORY COST


  2. ABOUT ME Graduated from NIT Nagpur in 2008 Cleared Engineering Services Examination (ESE-UPSC) Exam & Got the offer letter from most of the Maharatna and Navratna Companies * Cleared GATE Exam Rate, Review, Recommend, Share Follow me on Unacademy at: https://unacademy.in/user/harsh.t aggarwal


  3. INVENTORY COST Inventory Cost Purchase Cost Ordering or set-up cost Holding or Carrying cost Shortage or Stock Out Cost


  4. INVENTORY COST 1.Purchase Cost: lt is the nominal cost or purchase price of the inventory and is normally considered during quantity discount. Purchase CostQuantity Purchased x Unit price of inventory 2. Ordering or set-up cost: It includes cost associated with processing and changing of purchase order, transportation, inspection for quality and so on. It is also known as procurement cost. When the units are produced with in the system it is called set-up cost and it refers to the cost associated with bringing production system into play. Ordering cost = no. of orders x cost/per order 3. Holding or Carrying cost It is the cost spend in storing or keeping an item in inventory. lt includes storage cost, damage and depreciation cost, handling cost, insurance cost, locked up capital interest, etc. It is directly proportional to the amount of inventory and the type of over which it is held. Holding CostAverage inventory x holding cost/ unit


  5. INVENTORY COST 4. Stock out Cost or Shortage Cost: It is the cost associated with not serving the customer as stock out simply means shortage of inventory item Shortage Cost = No. of units short x shortage cost/ unit


  6. CHARACTERISTICS OF INVENTORY Dependent and Independent demand item I. Dependent: In dependent demand the need for any item is a direct result of the need for some other iterm usually a higher level item of which it becomes a part. 2. Independent aThese are those items whose demand is not link to any other items.


  7. INVENTORY REVIEW SYSTEM Inventory Review System Q-system P-system or or Fixed order system Periodic Review System or or Reorder point system Fixed Period System or Two-bin system


  8. Q SYSTEM AND P SYSTEM I. Q System or Fixed Order System In this system a re-order point is fixed and as inventory level reaches this point a fresh order for a specified quantity is placed. In this system size of order (Q) is fixed while time of order (T) varies. 2. P system or Periodic Review System: In this system inventory level are reviewed after a fixed time and fresh orders are placed at that time. In this system inventory level are reviewed after a fixed time and fresh orders are placed at that time. In this system size of order (Q) varies and time of order (T) is fixed SS System- (combination of Q-system and P system)


  9. DETERMINISTIC AND PROBAB LIST C MODEL Deterministic: Demand and lead time are known with certainity and are constant. Here stock is filled up as soon as the stock reaches point O and thus no need to carry safety or buffer stock. I. Probabilistic: Here demand and lead time are not known with certainity and they need not be constant. This model need to provide safety or buffer stock to meet the unfavourable conditions. 2.


  10. THANK YOU