Panipat Thermal Station was main suppliar of electricity to almost whole Haryana for a long time. Later a lot of other ptojects were developed and Panipat plant was also bifurcated in to two all these are discussed in this lesson

Adv Manoj Vats
Practising Advocate a judicial aspirant Want to share my learnings of law so that others can also benefits from that

U
Unacademy user
Dk
it's very important for all. very nice
Harbir Singh
a year ago
Thank yu Deepak🙏
  1. Geography of Harvana Haryana-Irrigation and Hydroelectric Power pt 12 Presented by- Adv Manoj Vats...


  2. . KAKROI MICRO HYDEL PROJECT . The Kakroi Micro Hydel Project with ultra low head (1.9 meters) is located on Western Yamuna Canal (Delhi Branch) at Village Kakroi near Sonepat. . The canal meets partially the drinking water requirements of Delhi. This is a National demonstration Project for ultra low head Hydro Energy as selected by Alternate Hydro Electric Centre, Roorkee.


  3. The same envisaged the installation of 4 Units of 100 KW each. However, three units of 1oo KW each are installed at the Project. . Although the bay for the fourth unit is in position but the Unit was not been installed due to non-availability of water as it was linked with construction of SYL Canal.


  4. e Panipat Thermal Power Station . Panipat Thermal Power Station (PTPS) has a total installed generation capacity of 1360 MW comprising of four Units of no MW each, two Units of 210 MW each and two Units of 250 MW each.


  5. e As all the balance of plant facilities viz. Coal Handling Plant, Ash Handling Plant, Cooling towers, C.W. System are separate for 4x1o MW Unit 1 to 4 and are completely independent from Units 5 to 8.


  6. . Keeping this in view and in order to improve the performance of the Plant and to have a better control, a need was felt to bifurcate PTPS into two Thermal Power Station i.e. PTPS-1, comprising of 4xIIoMW Units 1 to 4 and PTPS-2 comprising of 210MW /250MW Units 5 to 8.


  7. . In this regard the Board of Directors in its 54th meeting held on 29.03.07, approved the proposal of bifurcation of Panipat Thermal Power Station, Panipat into two Thermal Power Stations i.e. PTPS-I


  8. . The matter was subsequently taken up with Central Electricity Authority (CEA), New Delhi for according approval of Government of India (Ministry of Power) regarding bifurcation of PTPS.CEA, New Delhi vide letter dated 16.10.07 have conveyed their acceptance to HPGCL proposal of bifurcation of Panipat Thermal Power Station into two Thermal Power Stations namely PTPS-1 and PTPS-2.