Sign up now
to enroll in courses, follow best educators, interact with the community and track your progress.
Download
Manufacturing and Production: Part 14
32 plays

More
Wire drawing

Ashish Futtan is teaching live on Unacademy Plus

Ashish Futtan
MTECH IIT Bombay|Quora Top Writer for GATE Mechanical 2019|Cracked IIT (ISM) Dhanbad,IIT DELHI|3 times GATE qualified| Singer|

U
Unacademy user
thnku sir.sir pls previous years questions also discuss here.
selute for your hardwork and i really feel proud because i am your student.. thanks sir
Ashish Futtan
9 months ago
Thank you dear. It really means a lot to me
Ashish Futtan
9 months ago
Bs ab jaunga sone.
Ashish Futtan
9 months ago
Sajjad Mallick
9 months ago
🙏🙏🙏🙏
  1. manufacturing and production


  2. HELLO! I am ASHISH FUTTAN MTECH-IIT BOMBAY TOP STAR EDUCATOFR VERIFIED EDUCATOR CRACKED VARIOUS IITS 3 TIMES GATE QUALIFIED PUBLISHED MORE THAN 600 LESSONS


  3. IES Rotary swaging is 20t5s for shaping a)Round bars and tubes b)Billets c)Dies d)Rectangular blocks


  4. IES - 1993 Tandem drawing of wires and tubes is necessary because (a) It is not possible to reduce at one stage (b) Annealing is needed between stages (c) Accuracy in dimensions is not possible otherwise (d) Surface finish improves after every drawing stage


  5. IES - 2000 Match List I (Components of a table fan) with List II (Manufacturing processes) and select the correct answer using the codes given below the Lists: List I List II A. Base with stand 1. Stamping and pressing B. Blade 2. Wire drawing C. Armature coil wire 3. Turning D. Armature shaft 4. Casting Codes:A B C D A B C D (a) 4 3 2 1 (b) 2 1 4 3 (c) 2 3 4 1 (d) 41 2 3


  6. IES - 1999 Match List-I with List-ll and select the correct answer using the codes given below the Lists: List-l List-ll A. Drawing 1. Soap solution B. Rolling 2. Camber C. Wire drawing 3. Pilots D. Sheet metal operations using 4. Crater progressive dies 5. Ironing Code:A BC DA B C D (a) 2 5 1 4 (b) 415 3 (c) 5 2 3 4 (d) 5 2 1 3


  7. IES - 1996 Match List I with List II and select the correct answer List I (Metal/forming process) List II (Associated force) A. Wire drawing 1. Shear force B. Extrusion 2. Tensile force C. Blanking 3. Compressive force D. Bending 4. Spring back force Codes:A B C D A B C D (a) 4 2 1 3 (b) 2 1 3 4 (c) 2 3 1 4 (d) 4 3 2 1


  8. IES - 1994 Match List I with List II and select the correct answer using the codes given below the Lists: List I (Metal farming process) List Il (A similar process) A. Blanking 1. Wire drawing B. Coining 2. Piercing C. Extrusion 3. Embossing D. Cup drawing 4. Rolling 5. Bending Codes:A B C D A B C D (a) 2 3 4 1 (b) 2 3 1 4 (c) 3 2 1 5 (d) 2 3 1 5


  9. lES - 1993, ISRO-2010 Match List I with List I and select the correct answer using the codes given below the ists: List I (Mechanical property) List II (Related to) A. Malleability 1. Wire drawing B. Hardness 2. Impact loads C. Resilience 3. Cold rolling D. Isotropy 4. Indentation 5. Direction Codes:A B C D A B C D (a) 4 2 1 3 (b) 3 4 2 5 (c) 5 4 2 3 (d) 3 2 1 5


  10. IES - 2002 Match List with List II and select the correct answer: List I (Parts) List II (Manufacturing processes) A. Seamless tubes 1. Roll forming B. Accurate and smooth tubes 2. Shot peening C. Surfaces having higher 3. Forging hardness and fatigue strength 4. Cold forming Codes: A B C A B C (a) 1 4 2 (b) 2 3 1 (c) 1 3 2 (d) 2 4 1