Please Login To Continue

CL wadhwa bits solutions (15 - 21)

Lesson 4 of 21 • 53 upvotes • 15:00mins

Avatar

Anvesh Sameer

15. The per cent bias for a generator protection lies between: (a) 5 to 10 (b) 10 to 15 (c) 15 to 20 (d) None of the above. 16. For protection of parallel feeders fed from one end the relays required are: (a) Non-directional relays at the source end and directional relays at the load end. (b) Non-directional relays at both the ends. (c) Directional relays at the source end and non-directional at the load end. (d) Directional relays at both the ends. 17. The number of pilot wires required for protecting 3-phase transmission lines using Translay system of protection is: (a) 6 (b) 4 (c) 3 (d) 2. 18. A shunt fault is characterized by: (a) Increase in current, frequency and p.f. (b) Increase in current reduction in frequency and p.f. (c) Increase in current and frequency but reduction in p.f. (d) None of the above. 19. For measuring positive, negative and zero sequence voltages in a system, the reference is taken as: (a) Neutral of the system only (b) Ground only (c) For zero sequence neutral and for positive and negative the ground (d) None of the above. 20. The most economic load on an overhead line is: (a) Greater than the natural load (b) Less than the natural load (c) Equal to the natural load (d) None of the above is necessary. 21. The most economic load on an underground cable is: (a) Greater than its surge loading (b) Less than the surge loading (c) Equal to the surge loading (d) None of the above is necessary.

Continue on app
1

Overview

7:09mins

2

CL Wadhwa bits Solutions (1-7)

14:57mins

3

CL WADHWA bits solutions (8-14)

14:59mins

4

CL wadhwa bits solutions (15 - 21)

15:00mins

5

CL wadhwa bits solutions (22-28)

13:35mins

6

CL wadhwa bits solutions (29-35)

13:26mins

7

CL wadhwa bits solutions (35-40)

13:17mins

8

CL wadhwa bits solutions (41 - 46)

15:00mins

9

CL wadhwa bits solutions(47-52)

8:01mins

10

CL wadhwa bits solutions (53-58)

8:29mins

11

CL wadhwa bits solutions (59-65)

11:04mins

12

CL wadhwa bits solutions (66-71)

10:37mins

13

CL wadhwa bits solutions (72 - 77)

9:24mins

14

CL wadhwa bits solutions (78-85)

12:30mins

15

CL wadhwa bits solutions (86-92)

14:59mins

16

CL wadhwa bits solutions (93-100)

14:12mins

17

CL wadhwa bits solutions (101-105)

14:49mins

18

CL wadhwa bits solutions (106-110)

14:58mins

19

CL wadhwa bits solutions (110-114)

7:34mins

20

CL wadhwa bits solutions (115-119)

6:42mins

21

CL WADHWA bits solutions (120-124)

14:59mins

Crack Gate (Electrical) with Unacademy

Get subscription and access unlimited live and recorded courses from India's best educators
Structured syllabus
Structured syllabus
Daily live classes
Daily live classes
Ask doubts
Ask doubts
Tests & practice
Tests & practice

More from Anvesh Sameer

thumbnail
EnglishElectrical Engineering

Understand the concept of Discharge lamps

Anvesh Sameer

Similar Plus Courses

Unacademy is India’s largest online learning platform. Download our apps to start learning


Starting your preparation?

Call us and we will answer all your questions about learning on Unacademy

Call +91 8585858585
Company
About usShikshodayaCareersBlogsPrivacy PolicyTerms and Conditions
Products
Learner appLearner appEducator appEducator appParent appParent app