Please Login To Continue

CL WADHWA bits solutions (120-124)

Lesson 21 of 21 • 45 upvotes • 14:59mins

Avatar

Anvesh Sameer

120. If Ia1 is the positive sequence current of an alternator and Z1, Z2 and Z0 are the sequence impedances of the alternator. The drop produced by the current Ia1 will be: (a) Ia1 Z1 (b) Ia1 (Z1 + Z2) (c) Ia1 (Z1 + Z2 + Z0) (d) Ia1 (Z2 + Z0). 121. For the system shown in diagram below, a line-to-ground fault on the line side of the transformer is equivalent to: (a) A line-to-ground fault on the generator side of the transformer (b) A line-to-line fault on the generator side of the transformer (c) A double line-to-ground on the generator side of the transformer (d) A 3-phase fault on the generator side of the transformer. × F        122. The positive sequence component of voltage at the point of fault is zero when it is a: (a) 3-phase fault (b) L-L fault (c) L-L-G fault (d) L-G fault. 123. Tick out the correct statement: (a) The negative and zero sequence voltages are maximum at the fault point and decrease towards the neutral (b) The negative and zero sequence voltages are minimum at the fault point and increase towards the neutral (c) The negative sequence is maximum and zero sequence minimum at the fault point and decrease and increase respectively towards the neutral. (d) None of the above. 124. For complete protection of a 3-phase line: (a) Three-phase and three-earth fault relays are required (b) Three-phase and two-earth fault relays are required (c) Two-phase and two-earth fault relays are required (d) Two-phase and one-earth fault relays are required.

Continue on app
1

Overview

7:09mins

2

CL Wadhwa bits Solutions (1-7)

14:57mins

3

CL WADHWA bits solutions (8-14)

14:59mins

4

CL wadhwa bits solutions (15 - 21)

15:00mins

5

CL wadhwa bits solutions (22-28)

13:35mins

6

CL wadhwa bits solutions (29-35)

13:26mins

7

CL wadhwa bits solutions (35-40)

13:17mins

8

CL wadhwa bits solutions (41 - 46)

15:00mins

9

CL wadhwa bits solutions(47-52)

8:01mins

10

CL wadhwa bits solutions (53-58)

8:29mins

11

CL wadhwa bits solutions (59-65)

11:04mins

12

CL wadhwa bits solutions (66-71)

10:37mins

13

CL wadhwa bits solutions (72 - 77)

9:24mins

14

CL wadhwa bits solutions (78-85)

12:30mins

15

CL wadhwa bits solutions (86-92)

14:59mins

16

CL wadhwa bits solutions (93-100)

14:12mins

17

CL wadhwa bits solutions (101-105)

14:49mins

18

CL wadhwa bits solutions (106-110)

14:58mins

19

CL wadhwa bits solutions (110-114)

7:34mins

20

CL wadhwa bits solutions (115-119)

6:42mins

21

CL WADHWA bits solutions (120-124)

14:59mins

Crack Gate (Electrical) with Unacademy

Get subscription and access unlimited live and recorded courses from India's best educators
Structured syllabus
Structured syllabus
Daily live classes
Daily live classes
Ask doubts
Ask doubts
Tests & practice
Tests & practice

More from Anvesh Sameer

thumbnail
EnglishECE

Revision of Synchronous Machines in 60 minutes (using formulae)

Anvesh Sameer

Similar Plus Courses

Unacademy is India’s largest online learning platform. Download our apps to start learning


Starting your preparation?

Call us and we will answer all your questions about learning on Unacademy

Call +91 8585858585
Company
About usShikshodayaCareersBlogsPrivacy PolicyTerms and Conditions
Products
Learner appLearner appEducator appEducator appParent appParent app