Lesson 12 of 27 • 29 upvotes • 12:03mins
Design of vertical drop weir
27 lessons • 5h 38m
Course Overview WRE 2 (in Hindi)
3:40mins
Cross Drainage Structures (in Hindi)
9:36mins
Design of Sarda Fall (in Hindi)
11:12mins
Question on Design of Sarda Fall (in Hindi)
9:11mins
Question on Design of Sarda Fall (Part 2) (in Hindi)
10:46mins
Important terms of water resources engineering
14:31mins
Diversion headworks
14:52mins
Bligh's theory
14:57mins
Khosla's method of independent variables
12:57mins
Question of khosla's method( part 1)
13:45mins
Question of khosla's method (part 2)
14:54mins
Design of vertical drop weir(part 1)
12:03mins
Design of vertical drop weir (part 2)
9:52mins
Design of vertical drop weir (part 3)
14:42mins
Embankment dam and Gravity dam (part 1)
13:55mins
Embankment dam and Gravity dam ( part 2)
14:45mins
Embankment dam and Gravity dam(part 3)
14:53mins
Embankment dam and Gravity dam (part 4)
13:14mins
Embankment dam and Gravity dam(part 5)
11:12mins
Embankment dam and Gravity dam (part 6)
12:43mins
Embankment dam and Gravity dam (part 7)
11:17mins
Spillways and hydro power plant(part 1)
10:15mins
Spillways and hydro power plant (part 2)
14:41mins
Reservoirs optimization(part 1)
13:19mins
Reservoirs optimization (part 2)
11:56mins
Reservoir optimization (part 3)
14:30mins
Student doubts
14:30mins