Which one of the following statements is FALSE?
A resource conflict is a situation when more than one instruction tries to access the same resource in the same cycle.
None of the Above
To minimize data dependency stalls in the pipeline, operand forwarding is used.
Resource conflict is the reason for data dependency.
Basics of Computer Design
Machine Instructions
Addressing Mode
CISC and RISC Architectures
Measuring CPU Performance
ALU,Data-Path & Control Unit
Control Unit and Design
Pipelining
Memory Hierarchy Design
Cache Memory
Secondary Storage
I/O interface
Data Transfer Techniques
Direct Memory Access (DMA)
Boost your performance with adaptive practice tests
Practice every concept in the syllabus
Compare your speed and accuracy with your peers
Download the app and practice on the go